<< Chapter < Page Chapter >> Page >

The idea behind the waterfall model may be "measure twice; cut once", and those opposed to the waterfall model argue that this idea tends to fall apart when the problem being measured is constantly changing due to requirement modifications and new realizations about the problem itself. The idea behind those who object to the waterfall model may be "time spent in reconnaissance is seldom wasted".

In summary, the criticisms of a non-iterative development approach (such as the waterfall model) are as follows:

  • Many software projects must be open to change due to external factors; the majority of software is written as part of a contract with a client, and clients are notorious for changing their stated requirements. Thus the software project must be adaptable, and spending considerable effort in design and implementation based on the idea that requirements will never change is neither adaptable nor realistic in these cases.
  • Unless those who specify requirements and those who design the software system in question are highly competent, it is difficult to know exactly what is needed in each phase of the software process before some time is spent in the phase "following" it. That is, feedback from following phases is needed to complete "preceding" phases satisfactorily. For example, the design phase may need feedback from the implementation phase to identify problem design areas. The counter-argument for the waterfall model is that experienced designers may have worked on similar systems before, and so may be able to accurately predict problem areas without time spent prototyping and implementing.
  • Constant testing from the design, implementation and verification phases is required to validate the phases preceding them. Constant "prototype design" work is needed to ensure that requirements are non-contradictory and possible to fulfill; constant implementation is needed to find problem areas and inform the design process; constant integration and verification of the implemented code is necessary to ensure that implementation remains on track. The counter-argument for the waterfall model here is that constant implementation and testing to validate the design and requirements is only needed if the introduction of bugs is likely to be a problem. Users of the waterfall model may argue that if designers (et cetera) follow a disciplined process and do not make mistakes that there is no need for constant work in subsequent phases to validate the preceding phases.
  • Frequent incremental builds (following the "release early, release often" philosophy) are often needed to build confidence for a software production team and their client.
  • It is difficult to estimate time and cost for each phase of the development process without doing some "recon" work in that phase, unless those estimating time and cost are highly experienced with the type of software product in question.
  • The waterfall model brings no formal means of exercising management control over a project and planning control and risk management are not covered within the model itself.
  • Only a certain number of team members will be qualified for each phase; thus to have "code monkeys" who are only useful for implementation work do nothing while designers "perfect" the design is a waste of resources. A counter-argument to this is that "multiskilled" software engineers should be hired over "specialized" staff.

Iterative process

Iterative process

Iterative development prescribes the construction of initially small but ever larger portions of a software project to help all those involved to uncover important issues early before problems or faulty assumptions can lead to disaster. Iterative processes are preferred by commercial developers because it allows a potential of reaching the design goals of a customer who does not know how to define what they want.

While Iterative development approaches have their advantages, software architects are still faced with the challenge of creating a reliable foundation upon which to develop. Such a foundation often requires a fair amount of upfront analysis and prototyping to build a development model. The development model often relies upon specific design patterns and entity relationship diagrams (ERD). Without this upfront foundation, Iterative development can create long term challenges that are significant in terms of cost and quality.

Critics of iterative development approaches point out that these processes place what may be an unreasonable expectation upon the recipient of the software: that they must possess the skills and experience of a seasoned software developer. The approach can also be very expensive if iterations are not small enough to mitigate risk; akin to... "If you don't know what kind of house you want, let me build you one and see if you like it. If you don't, we'll tear it all down and start over." By analogy the critic argues that up-front design is as necessary for software development as it is for architecture. The problem with this criticism is that the whole point of iterative programming is that you don't have to build the whole house before you get feedback from the recipient. Indeed, in a sense conventional programming places more of this burden on the recipient, as the requirements and planning phases take place entirely before the development begins, and testing only occurs after development is officially over.

These approaches have been developed along with web based technologies. As such, they are actually more akin to maintenance life cycles given that most of the architecture and capability of the solutions is embodied within the technology selected as the back bone of the application.

References:

http://en.wikipedia.org/wiki/Software_development_process, http://ocw.mit.edu/OcwWeb/Electrical-Engineering-and-Computer-Science/6-171Fall2003/CourseHome/,http://www.cs.cornell.edu/courses/cs501/2008sp/, http://www.comp.lancs.ac.uk/computing/resources/IanS/SE7/,http://www.ee.unb.ca/kengleha/courses/CMPE3213/IntroToSoftwareEng.htm, http://www.d.umn.edu/~gshute/softeng/process.html,http://www.sei.cmu.edu/community/easel/demos/SWprocess.html, etc...

Questions & Answers

what does mean opportunity cost?
Aster Reply
what is poetive effect of population growth
Solomon Reply
what is inflation
Nasir Reply
what is demand
Eleni
what is economics
IMLAN Reply
economics theory describes individual behavior as the result of a process of optimization under constraints the objective to be reached being determined by
Kalkidan
Economics is a branch of social science that deal with How to wise use of resource ,s
Kassie
need
WARKISA
Economic Needs: In economics, needs are goods or services that are necessary for maintaining a certain standard of living. This includes things like healthcare, education, and transportation.
Kalkidan
What is demand and supply
EMPEROR Reply
deman means?
Alex
what is supply?
Alex
ex play supply?
Alex
Money market is a branch or segment of financial market where short-term debt instruments are traded upon. The instruments in this market includes Treasury bills, Bonds, Commercial Papers, Call money among other.
murana Reply
good
Kayode
what is money market
umar Reply
Examine the distinction between theory of comparative cost Advantage and theory of factor proportion
Fatima Reply
What is inflation
Bright Reply
a general and ongoing rise in the level of prices in an economy
AI-Robot
What are the factors that affect demand for a commodity
Florence Reply
price
Kenu
differentiate between demand and supply giving examples
Lambiv Reply
differentiated between demand and supply using examples
Lambiv
what is labour ?
Lambiv
how will I do?
Venny Reply
how is the graph works?I don't fully understand
Rezat Reply
information
Eliyee
devaluation
Eliyee
t
WARKISA
hi guys good evening to all
Lambiv
multiple choice question
Aster Reply
appreciation
Eliyee
explain perfect market
Lindiwe Reply
In economics, a perfect market refers to a theoretical construct where all participants have perfect information, goods are homogenous, there are no barriers to entry or exit, and prices are determined solely by supply and demand. It's an idealized model used for analysis,
Ezea
Got questions? Join the online conversation and get instant answers!
Jobilize.com Reply

Get Jobilize Job Search Mobile App in your pocket Now!

Get it on Google Play Download on the App Store Now




Source:  OpenStax, Software engineering. OpenStax CNX. Jul 29, 2009 Download for free at http://cnx.org/content/col10790/1.1
Google Play and the Google Play logo are trademarks of Google Inc.

Notification Switch

Would you like to follow the 'Software engineering' conversation and receive update notifications?

Ask