<< Chapter < Page
  Xna game studio     Page 7 / 16
Chapter >> Page >

Figure 4 . Cropped upper-left corner of the game window without honoring alpha transparency.

Missing image

Honoring alpha transparency is the default in XNA 4.0. Figure 4 was created by setting the Premultiply Alpha property (see Figure 7 ) of the image named gorightarrow.png to a value of False and then re-running the program.

Not a very exciting program

This program isn't very exciting because there is no motion and no sound. The program simply draws the same image in the same position during every iterationof the game loop. Despite that, this program will give us the opportunity to drill down into the technical aspects of several areas of the XNA framework.

Discussion and sample code

Creating a new Windows Game project

Before getting into the details of the code, I'm going to walk you through the steps involved in creating this Windows Game project using XNA.

Step 1: Create a new Windows Game project named XNA0118Proj

Pull down the Visual C# File menu and select New Project as shown in Figure 5 .

Figure 5 . Select New Project on the Visual C# File menu.

Missing image

Select a Windows Game project

Select XNA Game Studio 4.0 in the left pane of the New Project dialog. Select the Windows Game (4.0) icon and enter the name of your project in the Name field. Enter the storage location in the Location field and click the OK button that is off screen further to the right in Figure 6 .

Figure 6 . Select a Windows Game project.

Missing image

Step 2: Add your image file to the Content folder

If necessary, pull down the View menu and select Other Windows . Then select Solution Explorer and/or Properties Window so that they are exposed on the right side of the IDE as shown in Figure 7 . (Note that the initial view of the Properties window is different from that shown in Figure 7 .)

Figure 7 . Solutions explorer and properties window exposed.

Missing image

Add your image to the Content folder

Assuming that your project is named XNA0118proj , right click on the XNA0118projContent (Content) folder in the Solution Explorer . Select Add/Existing Item in the dialog that follows. Browse to the image file that you are going to use and click the Add button. A copy of the image file should appear in the Content folder.

The Asset Name

Click the image file name in the Content folder and the information in the Properties Window should change to describe that file. Note the value of the Asset Name property in the Properties Window . You will need it later. (In this example, the value of the Asset Name in Figure 7 is gorightarrow .)

Steps 3, 4, and 5: Write code

The next three steps involve writing code to upgrade the skeleton version of the class definition of the Game1 class. I will explain that new code later. For now, the three steps for this example program are:

  • Declare two instance variables named myTexture and spritePosition .
  • Add a statement to the LoadContent method to load the image.
  • Add statements to the Draw method to cause the image to be drawn in the game window.

Modify two overridden methods

As you saw in Listing 3 , there are five overridden methods in the class definition for the Game1 class that you can modify to customize the class for your game. This program modifies only two of those methods:

Questions & Answers

how did you get 1640
Noor Reply
If auger is pair are the roots of equation x2+5x-3=0
Peter Reply
Wayne and Dennis like to ride the bike path from Riverside Park to the beach. Dennis’s speed is seven miles per hour faster than Wayne’s speed, so it takes Wayne 2 hours to ride to the beach while it takes Dennis 1.5 hours for the ride. Find the speed of both bikers.
MATTHEW Reply
420
Sharon
from theory: distance [miles] = speed [mph] × time [hours] info #1 speed_Dennis × 1.5 = speed_Wayne × 2 => speed_Wayne = 0.75 × speed_Dennis (i) info #2 speed_Dennis = speed_Wayne + 7 [mph] (ii) use (i) in (ii) => [...] speed_Dennis = 28 mph speed_Wayne = 21 mph
George
Let W be Wayne's speed in miles per hour and D be Dennis's speed in miles per hour. We know that W + 7 = D and W * 2 = D * 1.5. Substituting the first equation into the second: W * 2 = (W + 7) * 1.5 W * 2 = W * 1.5 + 7 * 1.5 0.5 * W = 7 * 1.5 W = 7 * 3 or 21 W is 21 D = W + 7 D = 21 + 7 D = 28
Salma
Devon is 32 32​​ years older than his son, Milan. The sum of both their ages is 54 54​. Using the variables d d​ and m m​ to represent the ages of Devon and Milan, respectively, write a system of equations to describe this situation. Enter the equations below, separated by a comma.
Aaron Reply
find product (-6m+6) ( 3m²+4m-3)
SIMRAN Reply
-42m²+60m-18
Salma
what is the solution
bill
how did you arrive at this answer?
bill
-24m+3+3mÁ^2
Susan
i really want to learn
Amira
I only got 42 the rest i don't know how to solve it. Please i need help from anyone to help me improve my solving mathematics please
Amira
Hw did u arrive to this answer.
Aphelele
hi
Bajemah
-6m(3mA²+4m-3)+6(3mA²+4m-3) =-18m²A²-24m²+18m+18mA²+24m-18 Rearrange like items -18m²A²-24m²+42m+18A²-18
Salma
complete the table of valuesfor each given equatio then graph. 1.x+2y=3
Jovelyn Reply
x=3-2y
Salma
y=x+3/2
Salma
Hi
Enock
given that (7x-5):(2+4x)=8:7find the value of x
Nandala
3x-12y=18
Kelvin
please why isn't that the 0is in ten thousand place
Grace Reply
please why is it that the 0is in the place of ten thousand
Grace
Send the example to me here and let me see
Stephen
A meditation garden is in the shape of a right triangle, with one leg 7 feet. The length of the hypotenuse is one more than the length of one of the other legs. Find the lengths of the hypotenuse and the other leg
Marry Reply
how far
Abubakar
cool u
Enock
state in which quadrant or on which axis each of the following angles given measure. in standard position would lie 89°
Abegail Reply
hello
BenJay
hi
Method
I am eliacin, I need your help in maths
Rood
how can I help
Sir
hmm can we speak here?
Amoon
however, may I ask you some questions about Algarba?
Amoon
hi
Enock
what the last part of the problem mean?
Roger
The Jones family took a 15 mile canoe ride down the Indian River in three hours. After lunch, the return trip back up the river took five hours. Find the rate, in mph, of the canoe in still water and the rate of the current.
cameron Reply
Shakir works at a computer store. His weekly pay will be either a fixed amount, $925, or $500 plus 12% of his total sales. How much should his total sales be for his variable pay option to exceed the fixed amount of $925.
mahnoor Reply
I'm guessing, but it's somewhere around $4335.00 I think
Lewis
12% of sales will need to exceed 925 - 500, or 425 to exceed fixed amount option. What amount of sales does that equal? 425 ÷ (12÷100) = 3541.67. So the answer is sales greater than 3541.67. Check: Sales = 3542 Commission 12%=425.04 Pay = 500 + 425.04 = 925.04. 925.04 > 925.00
Munster
difference between rational and irrational numbers
Arundhati Reply
When traveling to Great Britain, Bethany exchanged $602 US dollars into £515 British pounds. How many pounds did she receive for each US dollar?
Jakoiya Reply
how to reduced echelon form
Solomon Reply
Jazmine trained for 3 hours on Saturday. She ran 8 miles and then biked 24 miles. Her biking speed is 4 mph faster than her running speed. What is her running speed?
Zack Reply
d=r×t the equation would be 8/r+24/r+4=3 worked out
Sheirtina
Got questions? Join the online conversation and get instant answers!
Jobilize.com Reply

Get Jobilize Job Search Mobile App in your pocket Now!

Get it on Google Play Download on the App Store Now




Source:  OpenStax, Xna game studio. OpenStax CNX. Feb 28, 2014 Download for free at https://legacy.cnx.org/content/col11634/1.6
Google Play and the Google Play logo are trademarks of Google Inc.

Notification Switch

Would you like to follow the 'Xna game studio' conversation and receive update notifications?

Ask