The idea behind the waterfall model may be "measure twice; cut once", and those opposed to the waterfall model argue that this idea tends to fall apart when the problem being measured is constantly changing due to requirement modifications and new realizations about the problem itself. The idea behind those who object to the waterfall model may be "time spent in reconnaissance is seldom wasted".

In summary, the criticisms of a non-iterative development approach (such as the waterfall model) are as follows:

  • Many software projects must be open to change due to external factors; the majority of software is written as part of a contract with a client, and clients are notorious for changing their stated requirements. Thus the software project must be adaptable, and spending considerable effort in design and implementation based on the idea that requirements will never change is neither adaptable nor realistic in these cases.
  • Unless those who specify requirements and those who design the software system in question are highly competent, it is difficult to know exactly what is needed in each phase of the software process before some time is spent in the phase "following" it. That is, feedback from following phases is needed to complete "preceding" phases satisfactorily. For example, the design phase may need feedback from the implementation phase to identify problem design areas. The counter-argument for the waterfall model is that experienced designers may have worked on similar systems before, and so may be able to accurately predict problem areas without time spent prototyping and implementing.
  • Constant testing from the design, implementation and verification phases is required to validate the phases preceding them. Constant "prototype design" work is needed to ensure that requirements are non-contradictory and possible to fulfill; constant implementation is needed to find problem areas and inform the design process; constant integration and verification of the implemented code is necessary to ensure that implementation remains on track. The counter-argument for the waterfall model here is that constant implementation and testing to validate the design and requirements is only needed if the introduction of bugs is likely to be a problem. Users of the waterfall model may argue that if designers (et cetera) follow a disciplined process and do not make mistakes that there is no need for constant work in subsequent phases to validate the preceding phases.
  • Frequent incremental builds (following the "release early, release often" philosophy) are often needed to build confidence for a software production team and their client.
  • It is difficult to estimate time and cost for each phase of the development process without doing some "recon" work in that phase, unless those estimating time and cost are highly experienced with the type of software product in question.
  • The waterfall model brings no formal means of exercising management control over a project and planning control and risk management are not covered within the model itself.
  • Only a certain number of team members will be qualified for each phase; thus to have "code monkeys" who are only useful for implementation work do nothing while designers "perfect" the design is a waste of resources. A counter-argument to this is that "multiskilled" software engineers should be hired over "specialized" staff.

Iterative process

Iterative process

Iterative development prescribes the construction of initially small but ever larger portions of a software project to help all those involved to uncover important issues early before problems or faulty assumptions can lead to disaster. Iterative processes are preferred by commercial developers because it allows a potential of reaching the design goals of a customer who does not know how to define what they want.

While Iterative development approaches have their advantages, software architects are still faced with the challenge of creating a reliable foundation upon which to develop. Such a foundation often requires a fair amount of upfront analysis and prototyping to build a development model. The development model often relies upon specific design patterns and entity relationship diagrams (ERD). Without this upfront foundation, Iterative development can create long term challenges that are significant in terms of cost and quality.

Critics of iterative development approaches point out that these processes place what may be an unreasonable expectation upon the recipient of the software: that they must possess the skills and experience of a seasoned software developer. The approach can also be very expensive if iterations are not small enough to mitigate risk; akin to... "If you don't know what kind of house you want, let me build you one and see if you like it. If you don't, we'll tear it all down and start over." By analogy the critic argues that up-front design is as necessary for software development as it is for architecture. The problem with this criticism is that the whole point of iterative programming is that you don't have to build the whole house before you get feedback from the recipient. Indeed, in a sense conventional programming places more of this burden on the recipient, as the requirements and planning phases take place entirely before the development begins, and testing only occurs after development is officially over.

These approaches have been developed along with web based technologies. As such, they are actually more akin to maintenance life cycles given that most of the architecture and capability of the solutions is embodied within the technology selected as the back bone of the application.

References:

http://en.wikipedia.org/wiki/Software_development_process, http://ocw.mit.edu/OcwWeb/Electrical-Engineering-and-Computer-Science/6-171Fall2003/CourseHome/,http://www.cs.cornell.edu/courses/cs501/2008sp/, http://www.comp.lancs.ac.uk/computing/resources/IanS/SE7/,http://www.ee.unb.ca/kengleha/courses/CMPE3213/IntroToSoftwareEng.htm, http://www.d.umn.edu/~gshute/softeng/process.html,http://www.sei.cmu.edu/community/easel/demos/SWprocess.html, etc...

Questions & Answers

how do you get the 2/50
Abba Reply
number of sport play by 50 student construct discrete data
Aminu Reply
width of the frangebany leaves on how to write a introduction
Theresa Reply
Solve the mean of variance
Veronica Reply
Step 1: Find the mean. To find the mean, add up all the scores, then divide them by the number of scores. ... Step 2: Find each score's deviation from the mean. ... Step 3: Square each deviation from the mean. ... Step 4: Find the sum of squares. ... Step 5: Divide the sum of squares by n – 1 or N.
kenneth
what is error
Yakuba Reply
Is mistake done to something
Vutshila
Hy
anas
hy
What is the life teble
anas
hy
Jibrin
statistics is the analyzing of data
Tajudeen Reply
what is statics?
Zelalem Reply
how do you calculate mean
Gloria Reply
diveving the sum if all values
Shaynaynay
let A1,A2 and A3 events be independent,show that (A1)^c, (A2)^c and (A3)^c are independent?
Fisaye Reply
what is statistics
Akhisani Reply
data collected all over the world
Shaynaynay
construct a less than and more than table
Imad Reply
The sample of 16 students is taken. The average age in the sample was 22 years with astandard deviation of 6 years. Construct a 95% confidence interval for the age of the population.
Aschalew Reply
Bhartdarshan' is an internet-based travel agency wherein customer can see videos of the cities they plant to visit. The number of hits daily is a normally distributed random variable with a mean of 10,000 and a standard deviation of 2,400 a. what is the probability of getting more than 12,000 hits? b. what is the probability of getting fewer than 9,000 hits?
Akshay Reply
Bhartdarshan'is an internet-based travel agency wherein customer can see videos of the cities they plan to visit. The number of hits daily is a normally distributed random variable with a mean of 10,000 and a standard deviation of 2,400. a. What is the probability of getting more than 12,000 hits
Akshay
1
Bright
Sorry i want to learn more about this question
Bright
Someone help
Bright
a= 0.20233 b=0.3384
Sufiyan
a
Shaynaynay
How do I interpret level of significance?
Mohd Reply
It depends on your business problem or in Machine Learning you could use ROC- AUC cruve to decide the threshold value
Shivam
how skewness and kurtosis are used in statistics
Owen Reply
yes what is it
Taneeya
Got questions? Join the online conversation and get instant answers!
Jobilize.com Reply

Get Jobilize Job Search Mobile App in your pocket Now!

Get it on Google Play Download on the App Store Now




Source:  OpenStax, Software engineering. OpenStax CNX. Jul 29, 2009 Download for free at http://cnx.org/content/col10790/1.1
Google Play and the Google Play logo are trademarks of Google Inc.

Notification Switch

Would you like to follow the 'Software engineering' conversation and receive update notifications?

Ask