<< Chapter < Page Chapter >> Page >
Representation of numerical values is closely associating with error.

We have already discussed different types of errors and how to handle them. Surprisingly, however, we hardly ever mention about error while assigning values to different physical quantities. It is the general case. As a matter of fact, we should communicate error appropriately, as there is provision to link error with the values we write.

We can convey existence of error with the last significant digit of the numerical values that we assign. Implicitly, we assume certain acceptable level of error with the last significant digit. If we need to express the actual range of error, based on individual set of observations, then we should write specific range of error explicitly as explained in earlier module.

We are not always aware that while writing values, we are conveying the precision of measurement as well. Remember that random error is linked with the precision of measurement; and, therefore, to be precise we should follow rules that retain the precision of measurement through the mathematical operations that we carry out with the values.

Context of values

Before we go in details of the scheme, rules and such other aspects of writing values to quantities, we need to clarify the context of writing values.

We write values of a quantity on the assumption that there is no systematic error involved. This assumption is, though not realized fully in practice, but is required; as otherwise how can we write value, if we are not sure of its accuracy. If we have doubt on this count, there is no alternative other than to improve measurement quality by eliminating reasons for systematic error. Once, we are satisfied with the measurement, we are only limited to reporting the extent of random error.

Another question that needs to be answered is that why to entertain “uncertain” data (error) at all. Why not we ignore doubtful digit altogether? We have seen that eliminating doubtful digit results in greater inaccuracy (refer module on “errors in measurement”). Measuring value with suspect digit is more “accurate” even though it carries the notion of error. This is the reason why we prefer to live with error rather than without it.

We should also realize that error is associated with the smallest division of the scale i.e. its least count. Error is about reading the smallest division – not about estimating value between two consecutive markings of smallest divisions.

Significant figures

Significant figures comprises of digits, which are known reliably and one last digit in the sequence, which is not known reliably. We take an example of the measurement of length by a vernier scale. The measurement of a piece of rod is reported as 5.37 cm. This value comprises of three digits, “5”, “3” and “7”. All three digits are significant as the same are measured by the instrument. The value indicates, however, that last digit is “uncertain”. We know that least count of vernier scale is 10 - 4 m i.e 10 - 2 cm i.e 0.01 cm. There is a possibility of error, which is equal to half the least count i.e. 0.005 cm. The reported value may, therefore, lie between 5.365 cm and 5.375 cm.

Questions & Answers

how did you get 1640
Noor Reply
If auger is pair are the roots of equation x2+5x-3=0
Peter Reply
Wayne and Dennis like to ride the bike path from Riverside Park to the beach. Dennis’s speed is seven miles per hour faster than Wayne’s speed, so it takes Wayne 2 hours to ride to the beach while it takes Dennis 1.5 hours for the ride. Find the speed of both bikers.
MATTHEW Reply
420
Sharon
from theory: distance [miles] = speed [mph] × time [hours] info #1 speed_Dennis × 1.5 = speed_Wayne × 2 => speed_Wayne = 0.75 × speed_Dennis (i) info #2 speed_Dennis = speed_Wayne + 7 [mph] (ii) use (i) in (ii) => [...] speed_Dennis = 28 mph speed_Wayne = 21 mph
George
Let W be Wayne's speed in miles per hour and D be Dennis's speed in miles per hour. We know that W + 7 = D and W * 2 = D * 1.5. Substituting the first equation into the second: W * 2 = (W + 7) * 1.5 W * 2 = W * 1.5 + 7 * 1.5 0.5 * W = 7 * 1.5 W = 7 * 3 or 21 W is 21 D = W + 7 D = 21 + 7 D = 28
Salma
Devon is 32 32​​ years older than his son, Milan. The sum of both their ages is 54 54​. Using the variables d d​ and m m​ to represent the ages of Devon and Milan, respectively, write a system of equations to describe this situation. Enter the equations below, separated by a comma.
Aaron Reply
find product (-6m+6) ( 3m²+4m-3)
SIMRAN Reply
-42m²+60m-18
Salma
what is the solution
bill
how did you arrive at this answer?
bill
-24m+3+3mÁ^2
Susan
i really want to learn
Amira
I only got 42 the rest i don't know how to solve it. Please i need help from anyone to help me improve my solving mathematics please
Amira
Hw did u arrive to this answer.
Aphelele
hi
Bajemah
-6m(3mA²+4m-3)+6(3mA²+4m-3) =-18m²A²-24m²+18m+18mA²+24m-18 Rearrange like items -18m²A²-24m²+42m+18A²-18
Salma
complete the table of valuesfor each given equatio then graph. 1.x+2y=3
Jovelyn Reply
x=3-2y
Salma
y=x+3/2
Salma
Hi
Enock
given that (7x-5):(2+4x)=8:7find the value of x
Nandala
3x-12y=18
Kelvin
please why isn't that the 0is in ten thousand place
Grace Reply
please why is it that the 0is in the place of ten thousand
Grace
Send the example to me here and let me see
Stephen
A meditation garden is in the shape of a right triangle, with one leg 7 feet. The length of the hypotenuse is one more than the length of one of the other legs. Find the lengths of the hypotenuse and the other leg
Marry Reply
how far
Abubakar
cool u
Enock
state in which quadrant or on which axis each of the following angles given measure. in standard position would lie 89°
Abegail Reply
hello
BenJay
hi
Method
I am eliacin, I need your help in maths
Rood
how can I help
Sir
hmm can we speak here?
Amoon
however, may I ask you some questions about Algarba?
Amoon
hi
Enock
what the last part of the problem mean?
Roger
The Jones family took a 15 mile canoe ride down the Indian River in three hours. After lunch, the return trip back up the river took five hours. Find the rate, in mph, of the canoe in still water and the rate of the current.
cameron Reply
Shakir works at a computer store. His weekly pay will be either a fixed amount, $925, or $500 plus 12% of his total sales. How much should his total sales be for his variable pay option to exceed the fixed amount of $925.
mahnoor Reply
I'm guessing, but it's somewhere around $4335.00 I think
Lewis
12% of sales will need to exceed 925 - 500, or 425 to exceed fixed amount option. What amount of sales does that equal? 425 ÷ (12÷100) = 3541.67. So the answer is sales greater than 3541.67. Check: Sales = 3542 Commission 12%=425.04 Pay = 500 + 425.04 = 925.04. 925.04 > 925.00
Munster
difference between rational and irrational numbers
Arundhati Reply
When traveling to Great Britain, Bethany exchanged $602 US dollars into £515 British pounds. How many pounds did she receive for each US dollar?
Jakoiya Reply
how to reduced echelon form
Solomon Reply
Jazmine trained for 3 hours on Saturday. She ran 8 miles and then biked 24 miles. Her biking speed is 4 mph faster than her running speed. What is her running speed?
Zack Reply
d=r×t the equation would be 8/r+24/r+4=3 worked out
Sheirtina
Got questions? Join the online conversation and get instant answers!
Jobilize.com Reply

Get Jobilize Job Search Mobile App in your pocket Now!

Get it on Google Play Download on the App Store Now




Source:  OpenStax, Physics for k-12. OpenStax CNX. Sep 07, 2009 Download for free at http://cnx.org/content/col10322/1.175
Google Play and the Google Play logo are trademarks of Google Inc.

Notification Switch

Would you like to follow the 'Physics for k-12' conversation and receive update notifications?

Ask