<< Chapter < Page Chapter >> Page >

When evaluating a logical expression, the final outcome can often be determined without the requirement to evaluate all of the operands.

Once the final outcome is determined, no attempt is made to evaluate the remainder of the expression. This is short-circuit evaluation.

Code from Question 1

Consider the following code fragment from Question 1 :

int x = 5, y = 6; if((x>y) || (y<x/0)){ ...

The (||) operator is the logical or operator.

Boolean operands required

This operator requires that its left and right operands both be of type boolean . This operator performs an inclusive or on its left and right operands. The rules for an inclusive or are:

If either of its operands is true, the operator returns true. Otherwise, it returns false.

Left operand is false

In this particular expression, the value of x is not greater than the value of y . Therefore, the left operand of the logical or operator is not true.

Right operand must be evaluated

This means that the right operand must be evaluated in order to determine the final outcome.

Right operand attempts to divide by zero

However, when an attempt is made to evaluate the right operand, an attempt is made to divide x by zero. This throws an exception, which is not caught and handled by the program, so the program terminates as described in Question 1 .

Similar code from Question 2

Now consider the following code fragment from Question 2 .

int x = 5, y = 6; if((x<y) || (y<x/0)){ System.out.println("A");...

Note that the right operand of the logical or operator still contains an expression that attempts to divide the integer x by zero.

No runtime error in this case

This program does not terminate with a runtime error. Why not?

And the answer is ...

In this case, x is less than y . Therefore, the left operand of the logical or operator is true.

Remember the rule for inclusive or

It doesn't matter whether the right operand is true or false. The final outcome is determined as soon as it is determined that the left operand is true.

The bottom line

Because the final outcome has been determined as soon as it is determined that the left operand is true, no attempt is made toevaluate the right operand.

Therefore, no attempt is made to divide x by zero, and no runtime error occurs.

Short-circuit evaluation

This behavior is often referred to as short-circuit evaluation .

Only as much of a logical expression is evaluated as is required to determine the final outcome.

Once the final outcome is determined, no attempt is made to evaluate the remainder of the logical expression.

This is not only true for the logical or operator, it is also true for the logical and operator, which consists of two ampersand characters with no space between them.

Back to Question 2

Answer 1

B. Runtime Error

Explanation 1

Divide by zero

Whenever a Java program attempts to evaluate an expression requiring that a value of one of the integer types be divided by zero, it will throw an ArithmeticException . If this exception is not caught and handled by the program, it will cause the program to terminate.

Attempts to divide x by 0

This program attempts to evaluate the following expression:

(y<x/0)

This expression attempts to divide the variable named x by zero. This causes the program to terminate with the following error message when running under JDK 1.3:

java.lang.ArithmeticException: / by zero at Worker.doLogical(Ap039.java:13)at Ap039.main(Ap039.java:6)

Back to Question 1

-end-

Questions & Answers

What is inflation
Bright Reply
a general and ongoing rise in the level of prices in an economy
AI-Robot
What are the factors that affect demand for a commodity
Florence Reply
differentiate between demand and supply giving examples
Lambiv Reply
differentiated between demand and supply using examples
Lambiv
what is labour ?
Lambiv
how will I do?
Venny Reply
how is the graph works?I don't fully understand
Rezat Reply
information
Eliyee
devaluation
Eliyee
t
WARKISA
hi guys good evening to all
Lambiv
multiple choice question
Aster Reply
appreciation
Eliyee
explain perfect market
Lindiwe Reply
In economics, a perfect market refers to a theoretical construct where all participants have perfect information, goods are homogenous, there are no barriers to entry or exit, and prices are determined solely by supply and demand. It's an idealized model used for analysis,
Ezea
What is ceteris paribus?
Shukri Reply
other things being equal
AI-Robot
When MP₁ becomes negative, TP start to decline. Extuples Suppose that the short-run production function of certain cut-flower firm is given by: Q=4KL-0.6K2 - 0.112 • Where is quantity of cut flower produced, I is labour input and K is fixed capital input (K-5). Determine the average product of lab
Kelo
Extuples Suppose that the short-run production function of certain cut-flower firm is given by: Q=4KL-0.6K2 - 0.112 • Where is quantity of cut flower produced, I is labour input and K is fixed capital input (K-5). Determine the average product of labour (APL) and marginal product of labour (MPL)
Kelo
yes,thank you
Shukri
Can I ask you other question?
Shukri
what is monopoly mean?
Habtamu Reply
What is different between quantity demand and demand?
Shukri Reply
Quantity demanded refers to the specific amount of a good or service that consumers are willing and able to purchase at a give price and within a specific time period. Demand, on the other hand, is a broader concept that encompasses the entire relationship between price and quantity demanded
Ezea
ok
Shukri
how do you save a country economic situation when it's falling apart
Lilia Reply
what is the difference between economic growth and development
Fiker Reply
Economic growth as an increase in the production and consumption of goods and services within an economy.but Economic development as a broader concept that encompasses not only economic growth but also social & human well being.
Shukri
production function means
Jabir
What do you think is more important to focus on when considering inequality ?
Abdisa Reply
any question about economics?
Awais Reply
sir...I just want to ask one question... Define the term contract curve? if you are free please help me to find this answer 🙏
Asui
it is a curve that we get after connecting the pareto optimal combinations of two consumers after their mutually beneficial trade offs
Awais
thank you so much 👍 sir
Asui
In economics, the contract curve refers to the set of points in an Edgeworth box diagram where both parties involved in a trade cannot be made better off without making one of them worse off. It represents the Pareto efficient allocations of goods between two individuals or entities, where neither p
Cornelius
In economics, the contract curve refers to the set of points in an Edgeworth box diagram where both parties involved in a trade cannot be made better off without making one of them worse off. It represents the Pareto efficient allocations of goods between two individuals or entities,
Cornelius
Suppose a consumer consuming two commodities X and Y has The following utility function u=X0.4 Y0.6. If the price of the X and Y are 2 and 3 respectively and income Constraint is birr 50. A,Calculate quantities of x and y which maximize utility. B,Calculate value of Lagrange multiplier. C,Calculate quantities of X and Y consumed with a given price. D,alculate optimum level of output .
Feyisa Reply
Answer
Feyisa
c
Jabir
Got questions? Join the online conversation and get instant answers!
Jobilize.com Reply

Get Jobilize Job Search Mobile App in your pocket Now!

Get it on Google Play Download on the App Store Now




Source:  OpenStax, Object-oriented programming (oop) with java. OpenStax CNX. Jun 29, 2016 Download for free at https://legacy.cnx.org/content/col11441/1.201
Google Play and the Google Play logo are trademarks of Google Inc.

Notification Switch

Would you like to follow the 'Object-oriented programming (oop) with java' conversation and receive update notifications?

Ask